Project Deliverables
March 31st, 1998
At this time we should have some HTML done as needed for the project.
Most of the Historical Site information should have been found.
Prelimnary sketches of boat tour will be done and hopefully a skeleton of
what the VRML rendering will be like. A full group visit with client is
desired, but we are not quite sure if that is possible.
April 14th, 1998
For this date we should have all HTML and Historical information
finalized. We should have 1/4 of the VRML tour done, complete with water,
landscape and atleast one or two anchors. We will have had our visit with
our client by then as well. A skeleton VRML image of the outside of the
48" Universal Plate Mill should be done at this time as well.
Individual Deliverables
Robyn: *To read Chapter 6 and 7 and to find sky and ground color. To find
trees and other graphics and textures that may useful for scenary. To
complete the rest of the homepage so it adheres to specifications. To get
a view of the sky and ground, and hopefully the water on VRML for now.
Chad: *To draw renderings of what the landings will look like and what
the tour will look like. To begin a VRML tour, by putting a boat on the
water so a visitor can "look over the rails." To find pictures of sites
to use as landings if we choose todo this.
Matt: *To research and create HTML documents of the sites that will be
considered landings.
Johnathan: *To research and create HTML documents of the sites that will
be considered landings.
Individual Delivarables for April 14,
1998
Robyn and Chad: *To work together to put the pictures and textures and two
anchors on our tour. Visit with the client.
Matt and Johnthan: *To work together to put the HTML documents up to view
and add the background to the pages as well as help find pictures for the
sites. Finalization of all Historical Information. Visit with the
client.